Included in every plan

Equipment register app: never miss a service or a leak check again

Add each unit you look after once: what it is, where it is and how often it needs a service. Maintivo works out when every service and F-gas leak check is due, reminds the office at 90 days, 30 days and when overdue, and moves the date on when the visit is done.

iPhone: No card. No account. First report free to fill in.In your browser: Free account, no card. First report free to fill in.

Equipment: AC-03
One unit, what is due on it, and its last visit. (Drawing, made-up unit and dates.)
The chiller service and F-Gas form on iPhone: refrigerant charge, leak detection, tonnes CO2e worked out and the next leak check date. Sample company and names.
In short
  • One register for every unit you look after, searchable by tag, make, model, location or serial.
  • Each unit has a service interval in months, so the next service due date is set for you.
  • For air conditioning, heat pumps and chillers, Maintivo works out the CO₂e and the legal leak-check interval.
  • The owner and anyone with the “Equipment and templates” tick are reminded at 90 days, 30 days and when overdue.
  • Start job opens a report filled in with the unit’s details. Saving it marks the check done and sets the next date.
  • Reminders go to your firm, never to your customers.
How it works

How does the equipment register work?

You add each unit once. After that, every visit keeps its dates right for you.

  1. Add the unit

    Press Add unit: tag, make, model, serial no., location, install date and how often it needs a service. For air conditioning, heat pumps and chillers, add the refrigerant too.

  2. Get reminded

    The office is told 90 days and 30 days before a check is due, and again if it goes overdue. Home lists what is due.

  3. Do the visit

    Press Start job on the unit. The report opens with its details filled in, and saving it marks the check done and schedules the next one.

In the app

The register, on the phone

Real screens from the iPhone app. Sample company and equipment.

  1. The Equipment list on iPhone: each unit with its type, location and the date its next service is due. Sample company and names.
    1

    Every unit you look after

    Each unit with its type, location and next due date.

  2. The chiller form on iPhone: suction and discharge pressure, superheat and subcooling against design. Sample company and names.
    2

    The readings on the form

    Pressures, superheat and subcooling against design.

  3. One site on iPhone: its address, every report, quote and invoice there, and what is unpaid. Sample company and names.
    3

    History by site

    Every report, quote and invoice at the address.

The money side

What does a missed service cost you?

Work you could have booked, and a customer who starts to wonder what they pay you for. A register that reminds you turns each due date into a booked job.

A spreadsheet or a wall chart

Works until the month nobody opens it. Dates are worked out by hand, and a wrong leak-check interval can go unnoticed for a year.

The register in Maintivo

Due dates come to you as notifications. The leak-check interval is worked out from the refrigerant, and each visit moves the next date on by itself.

What goes in it

What equipment can you register?

Anything you service on a schedule. Pick the type when you press Add unit.

Cooling

Split AC / VRF

Air conditioning, with the refrigerant fields for F-gas leak checks.

Cooling

Chiller

With the refrigerant fields, so the leak-check interval is worked out for you.

Heat

Heat Pump

With the refrigerant fields too, and its own service interval.

Gas

Boiler and Gas appliances

Each with how often it needs a service. Landlord gas safety dates: see CP12 renewal reminders.

Air

MVHR, Extract System, Fan Coil Unit

Ventilation and terminal units, each with its own service interval.

More

HIU / FlatStation and Other

Heat interface units, and Other for anything else you look after.

FieldWhat it is for
TagYour own name or number for the unit, like AC-03, so it is quick to find.
Make, model and serial no.What the unit is, on the record and on the report.
LocationWhere it is on site, like “Roof, plant area”.
Install dateHow old the unit is.
Service every (months)With the date of the last service, sets the next service due date.
NotesAnything worth knowing next time.
Client, on the webWho the unit belongs to.
The Add unit form. Anyone on the team can add a unit.
F-gas leak checks

How is the leak-check interval worked out?

From the refrigerant, the charge and your company’s country. You fill in the facts, and Maintivo does the sum and sets the date.

  • ✓
    Refrigerant and charge (kg)Maintivo works out the CO₂e from them, so nobody does it on a calculator on the roof.
  • ✓
    Hermetically sealed, and leak detection fittedBoth can change the interval, so both are on the unit.
  • ✓
    Last leak checkThe next one is set from it, by the rules that apply to you.
Your company is inRules usedLeak-check date
Great BritainGB F-gas regulationsWorked out by Maintivo
The EUEU Regulation 2024/573Worked out by Maintivo
The USUS EPA rulesWorked out by Maintivo
Anywhere elseSet by the engineerThe engineer sets the interval and the date
The rules follow your company’s country, set by the owner in Settings.

The record itself is in the F-gas leak check app, and the bands are explained in how often a leak check is due.

  1. Settings on iPhone: country Ireland and Dublin time, with refrigerant rules for the EU F-Gas Regulation. Sample company and names.
    1

    Ireland: EU rules

    Refrigerant rules for the EU F-Gas Regulation.

  2. Settings on iPhone: country United States and Chicago time, with refrigerant rules for EPA Section 608. Sample company and names.
    2

    United States: EPA rules

    Refrigerant rules for EPA Section 608.

  3. A refrigeration leak check on iPhone for a firm in the United States: charge in tonnes CO2e and the leak repair rules. Sample company and names.
    3

    A US leak check

    The charge in tonnes CO2e and the leak repair rules.

Real screens from the iPhone app. Sample company and names.

Each unit’s page

What is on a unit’s page?

Everything about one unit in one place: what is due, what was done, and the buttons to act on it.

Due

Next due items

The next service, the next leak check and any reminder you added, each with its date.

Start job

A report, already filled in

Start job opens a report with the unit’s tag, make, model and location in place.

Visits

Every report on this unit

Each visit to the unit, so the next engineer sees what was done before.

Add reminder

Your own reminders

Pick the kind, add a note and a due date. Cancel it if plans change.

History

Done and cancelled

Completed and cancelled items stay on the page, so you can show what happened and when.

Decommission

Taken out, history kept

Decommission a unit and its open reminders are cancelled. Its visits and history stay.

When the visit is done, the dates move on by themselves:

The engineer

Presses Start job, fills in the report on site and saves it.

Maintivo

Marks the due check done and schedules the next: the service by its interval, the leak check by the rules, and a follow-up check after a leak repair.

Decommissioning a unit and cancelling a reminder need the “Equipment and templates” tick.

Reminders

Who is reminded, and when?

Your firm is, three times for each check. Customers are never sent these reminders.

WhenWhat happens
90 days beforeA notification that the check is coming up.
30 days beforeA notification to schedule an engineer.
OverdueA notification to book it in.
Notifications for each check that falls due, in the iPhone app and the browser.
  • ✓
    The owner, and the “Equipment and templates” tickThe owner gets them, and so does anyone the owner gives that tick to.
  • ✓
    In the iPhone app and the browserOn any browser where notifications are on in Settings > Notifications. For browser notifications on an iPhone, add the web app to the Home Screen.
  • ✓
    Listed on HomeHome shows Overdue, Due in 30 days and Units, with the next items. An engineer’s Home shows “Equipment due”.
Equipment on the iPhone Home screen: 1 overdue, 5 due soon and 6 registered, with each due service, leak check and gas safety check listed by date. Sample company and names.
On Home

What is overdue and due soon, on the Home screen

  • The countsOverdue, due soon and registered units, at the top.
  • Each item with its dateThe unit, where it is, what is due, and the date or the days it is over.
  • Nothing left without a dateA unit with no leak check scheduled shows Set a date, because nobody would be reminded.
Real screens from the iPhone app. Sample company and names.
Book it in

Can due services book themselves into the Diary?

Yes, if the owner switches on Book due services into the Diary. Every open due item, leak checks and follow-ups included, becomes a Diary job ahead of time.

  • ✓
    2 to 8 weeks aheadThe owner picks how far ahead: 2, 4, 6 or 8 weeks.
  • ✓
    09:00 on the due dateOn a weekday. A weekend date moves to the Monday after, and nothing is booked in the past.
  • ✓
    For the engineer who did the last oneIf they have left the team, the job waits with nobody assigned, for the office to pick.
  • ✓
    The customer is not emailedThe job says to check the time with the customer. Agree it, then send the appointment.

The full rules are in planned maintenance scheduling. Every visit also adds to the history of each property, and jobs sit in the team Diary. Included in every plan, from £34.99 a month: see pricing.

The Diary on iPad: the whole team week laid out by day, one colour per engineer. Sample company and names.
The Diary on iPhone, day view: each job with its status, such as finished, on site since 09:28 or on the way since 09:36, and the free time between. Sample company and names.
The Diary

Where booked services land

  • The week on iPadThe whole team laid out by day, one colour per engineer.
  • The day on iPhoneEach job with its engineer and status, and the free time between.
Real screens from the iPad and iPhone apps. Sample company and names.
Questions

Common questions

A list of every unit you look after: what it is, where it is, and when its next service and leak check are due. In Maintivo it is the Equipment screen, and each unit has its own page with its visits and history.

Split AC / VRF, Fan Coil Unit, MVHR, Extract System, HIU / FlatStation, Boiler, Heat Pump, Chiller, Gas appliances and Other. Anyone on the team can add a unit.

From the refrigerant, the charge, whether the unit is hermetically sealed or has leak detection fitted, and the date of the last leak check. It uses the rules for your company’s country: GB F-gas regulations, EU Regulation 2024/573 or US EPA rules. Elsewhere, the engineer sets the interval and the date.

No. Reminders go to your firm: the owner and anyone with the “Equipment and templates” tick, in the iPhone app and in the browser. Your customers hear from you when you send them the appointment.

No. Start job opens a report for the unit, and saving it marks the due check done and schedules the next one.

Press Decommission. Its open reminders are cancelled, and its visits and history are kept.

Yes, in every plan, from £34.99 a month. 14 days free and no contract.

Do your next report in Maintivo

Your first report is free to fill in, with no card and no training day. Run a real visit through it and see.

iPhone: No card. No account. First report free to fill in.In your browser: Free account, no card. First report free to fill in.